Kerex Engineering, Inc.
2 approvals totalling $802,550 approved by the county.
Every figure below was read out of the wording of the matter the Board voted on; the exact wording is shown under each one. This page states what the Board approved and who voted for it, and nothing beyond that.
26-2814 $344,400
AWARD and AUTHORIZE the Public Works Director, or designee, to execute a construction contract with Kerex Engineering, Inc. in the amount of $344,400 for the Piper Road Sinkhole and Culvert Repair, Bethel Island area. (75% FEMA Funds, 25% Local Road Funds)
Where these figures come from
Counterparty: “contract with Kerex Engineering, Inc.”
Amount: “in the amount of $344,400”
Both spans are quoted from the title of matter 26-2814 as the county published it.
Approved on the consent calendar, on this roll call: Yes Candace Andersen, Diane Burgis, John Gioia, Ken Carlson, Shanelle Scales-Preston
26-2133 $458,150
AWARD and AUTHORIZE the Chief Engineer, or designee, to execute a construction contract with Kerex Engineering, Inc. in the amount of $458,150 for the Pinole Creek Bank Erosion Repair, Pinole area (100% Flood Control Funds)
Where these figures come from
Counterparty: “contract with Kerex Engineering, Inc.”
Amount: “in the amount of $458,150”
Both spans are quoted from the title of matter 26-2133 as the county published it.
Approved on the consent calendar, on this roll call: Yes Candace Andersen, Diane Burgis, John Gioia, Ken Carlson, Shanelle Scales-Preston