APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a Phase 2 Progressive Design-Build Construction Contract with Truebeck Construction, Inc., to establish a Phase 2 Guaranteed Maximum Price in an amount not to exceed $105,113,697 (which includes an Owner-Controlled Contingency Allowance of $3,066,936) for the construction of the Contra Costa Regional Medical Center Cafeteria Building Upgrades Project in Martinez; and ADOPT a Notice of Exemption, and take related actions, pursuant to the California Environmental Quality Act, Martinez area (State Clearinghouse No. 2026011121). (56% Measure X Funds, 44% Hospital Enterprise Fund I)

Consent Item · Passed · requested by Public Works · passed 2026-06-23 · introduced 2026-06-09 · Board of Supervisors

What this matter awards

Read from this matter’s own title by an automated pass, not from the contract document. Where this matter was approved on a consent calendar, the roll call below covers the whole calendar, not this award alone.

The document

No operative document is on file for this matter — either the county attached none, or everything attached is supporting material.

Supporting material (2)

Filed with this matter but not the instrument that was voted on, so it is described here and linked to the county's copy rather than mirrored.

On the agenda

Source: Contra Costa County's Legistar record, matter 19351 (file 26-2800).