26-3139
APPROVE the Pinehurst Road Erosion Repair at Milepost 1.7 Project and AUTHORIZE the Public Works Director, or designee, to advertise the Project, Moraga area. (100% Local Road Funds)
The document
No operative document is on file for this matter — either the county attached none, or everything attached is supporting material.
Supporting material (1)
On the agenda
- C.95.Board of Supervisors