26-3916
Acting as the governing body of the Contra Costa County Flood Control and Water Conservation District, APPROVE and AUTHORIZE the Chief Engineer, or designee, to execute a contract amendment with CWE, to extend the term from September 29, 2026 to September 29, 2028, for on-call flood control facility design, with no change to the payment limit, Countywide. (No fiscal impact)
The document
No operative document is on file for this matter — either the county attached none, or everything attached is supporting material.
On the agenda
- C.87.Board of Supervisors